Week 5/2-5/6/2022
Date
Introduced
|
Sponsor(s)
|
Title
|
Number
Assigned
|
Committee
Assigned
|
Date
Circulated
|
Date of
Official
Action
|
5/2/2022
|
Chairman Mendelson and Councilmember Nadeau
|
Targeted Historic Preservation Assistance Emergency Declaration Resolution of 2022
|
Retained by the Council
|
5/2/2022
|
5/3/2022
|
|
5/2/2022
|
Chairman Mendelson and Councilmember Nadeau
|
Targeted Historic Preservation Assistance Emergency Amendment Act of 2022
|
Retained by the Council
|
5/2/2022
|
5/3/2022
|
|
5/2/2022
|
Chairman Mendelson and Councilmember Nadeau
|
Targeted Historic Preservation Assistance Temporary Amendment Act of 2022
|
Retained by the Council
|
5/2/2022
|
5/3/2022
|
|
5/2/2022
|
Councilmember Cheh
|
Green Finance Authority Board Quorum Emergency Declaration Resolution of 2022
|
Retained by the Council
|
5/2/2022
|
5/3/2022
|
|
5/2/2022
|
Councilmember Cheh
|
Green Finance Authority Board Quorum Emergency Amendment Act of 2022
|
Retained by the Council
|
5/2/2022
|
5/3/2022
|
|
5/2/2022
|
Councilmember Cheh
|
Green Finance Authority Board Quorum Temporary Amendment Act of 2022
|
Retained by the Council
|
5/2/2022
|
5/3/2022
|
|
5/2/2022
|
Councilmember Gray
|
East Capitol Gateway Eminent Domain Authority Congressional Review Emergency Declaration Resolution of 2022
|
Retained by the Council
|
5/2/2022
|
5/17/2022
|
|
5/2/2022
|
Councilmember Gray
|
East Capitol Gateway Eminent Domain Authority Congressional Review Emergency Act of 2022
|
Retained by the Council
|
5/2/2022
|
5/17/2022
|
|
5/2/2022
|
Councilmembers Gray, Cheh, Bonds
|
Coronavirus Support Remote Cooperative Association Meetings Emergency Declaration Resolution of 2022
|
Retained by the Council
|
5/2/2022
|
5/17/2022
|
|
5/2/2022
|
Councilmembers Gray, Cheh, Bonds
|
Coronavirus Support Remote Cooperative Association Meetings Emergency Amendment Act of 2022
|
Retained by the Council
|
5/2/2022
|
5/17/2022
|
|
5/2/2022
|
Councilmembers Gray, Cheh, Bonds
|
Coronavirus Support Remote Cooperative Association Meetings Temporary Amendment Act of 2022
|
Retained by the Council
|
5/2/2022
|
5/17/2022
|
|
5/2/2022
|
Chairman Mendelson at the request of the Mayor
|
Rental Housing Commission Michael Spencer Confirmation Emergency Declaration Resolution of 2022
|
5/2/2022
|
5/2/2022
|
||
5/2/2022
|
Chairman Mendelson at the request of the Mayor
|
Rental Housing Commission Michael Spencer Confirmation Emergency Approval Confirmation Resolution of 2022
|
5/2/2022
|
5/2/2022
|
||
5/2/2022
|
Chairman Mendelson
|
Engineering Licensure Emergency Declaration Resolution of 2022
|
Retained by the Council
|
5/2/2022
|
5/17/2022
|
|
5/2/2022
|
Chairman Mendelson
|
Engineering Licensure Emergency Amendment Act of 2022
|
Retained by the Council
|
5/2/2022
|
5/17/2022
|
|
4/21/2022
|
Chairman Mendelson at the request of the Mayor
|
Commission on Asian and Pacific Islander Community Development Artrisha Naidu Confirmation Resolution of 2022
|
Committee on Recreation, Libraries and Youth Affairs
|
5/2/2022
|
45 day review begins 5/4/2022
deemed approved 6/18/2022
|
|
4/21/2022
|
Chairman Mendelson at the request of the Mayor
|
Commission on Asian and Pacific Islander Community Development Jennifer Anderson Confirmation Resolution of 2022
|
Committee on Recreation, Libraries and Youth Affairs
|
5/2/2022
|
45 day review begins 5/4/2022
deemed approved 6/18/2022
|
|
4/21/2022
|
Chairman Mendelson at the request of the Mayor
|
Commission on Asian and Pacific Islander Community Development Jeffrey Le Confirmation Resolution of 2022
|
Committee on Recreation, Libraries and Youth Affairs
|
5/2/2022
|
45 day review begins 5/4/2022
deemed approved 6/18/2022
|
|
4/21/2022
|
Chairman Mendelson at the request of the Mayor
|
Commission on Asian and Pacific Islander Community Development Krishna Ghodiwala Confirmation Resolution of 2022
|
Committee on Recreation, Libraries and Youth Affairs
|
5/2/2022
|
45 day review begins 5/4/2022
deemed approved 6/18/2022
|
|
4/21/2022
|
Chairman Mendelson at the request of the Mayor
|
Commission on Asian and Pacific Islander Community Development Mike Park Confirmation Resolution of 2022
|
Committee on Recreation, Libraries and Youth Affairs
|
5/2/2022
|
45 day review begins 5/4/2022
deemed approved 6/18/2022
|
|
4/21/2022
|
Chairman Mendelson at the request of the Mayor
|
Commission on Asian and Pacific Islander Community Development Niranjan Adhikari Confirmation Resolution of 2022
|
Committee on Recreation, Libraries and Youth Affairs
|
5/2/2022
|
45 day review begins 5/4/2022
deemed approved 6/18/2022
|
|
4/21/2022
|
Councilmembers R.White, Allen, Lewis George, Nadeau, Pinto
|
Greener Government Buildings Amendment Act of 2022
|
Sequentially to the Committee on Government Operations and Facilities and the Committee on Transportation and the Environment
|
5/2/2022
|
5/3/2022
|
|
4/25/2022
|
Chairman Mendelson at the request of the Mayor
|
Modification Nos. 4, 5, and 6 to Contract No. DCKA-24 2019-C-0019 with Dewberry Engineers Inc. Approval and Payment Authorization Emergency Declaration Resolution of 2022
|
Retained with comments from the Committee on Transportation and the Environment
|
5/2/2022
|
5/3/2022
|
|
4/25//2022
|
Chairman Mendelson at the request of the Mayor
|
Modification Nos. 4, 5, and 6 to Contract No. DCKA-2019-C-0019 with Dewberry Engineers Inc. Approval and Payment Authorization Emergency Act of 2022
|
Retained with comments from the Committee on Transportation and the Environment
|
5/2/2022
|
5/3/2022
|
|
4/26//2022
|
Chairman Mendelson at the request of the Mayor
|
Modification Nos. 1 and 2 to Contract No. DCAM-20-CS-RFQ-0001M with Consys, Inc. Approval and Payment Authorization Emergency Declaration Resolution of 2022
|
Retained with comments from the Committee on Government Operations and Facilities
|
5/2/2022
|
5/3/2022
|
|
4/26//2022
|
Chairman Mendelson at the request of the Mayor
|
Modification Nos. 1 and 2 to Contract No. DCAM-20-CS-RFQ-0001M with Consys, Inc. Approval and Payment Authorization Emergency Act of 2022
|
Retained with comments from the Committee on Government Operations and Facilities
|
5/2/2022
|
5/3/2022
|
|
4/26//2022
|
Chairman Mendelson at the request of the Mayor
|
Modification Nos. 1 and 2 to Contract No. DCAM-20-CS-RFQ-0001P with BEDD Group, LLC Approval and Payment Authorization Emergency Declaration Resolution of 2022
|
Retained with comments from the Committee on Government Operations and Facilities
|
5/2/2022
|
5/3/2022
|
|
4/26//2022
|
Chairman Mendelson at the request of the Mayor
|
Modification Nos. 1 and 2 to Contract No. DCAM-20- CS-RFQ-0001P with BEDD Group, LLC Approval and Payment Authorization Emergency Act of 2022
|
Retained with comments from the Committee on Government Operations and Facilities
|
5/2/2022
|
5/3/2022
|
|
4/26//2022
|
Chairman Mendelson at the request of the Mayor
|
Modification Nos. 1 and 2 to Contract No. DCAM-20-CS-RFQ-0002N with Adrian L. Merton, Inc. Approval and Payment Authorization Emergency Declaration Resolution of 2022
|
Retained with comments from the Committee on Government Operations and Facilities
|
5/2/2022
|
5/3/2022
|
|
4/26//2022
|
Chairman Mendelson at the request of the Mayor
|
Modification Nos. 1 and 2 to Contract No. DCAM-20- CS-RFQ-0002N with Adrian L. Merton, Inc. Approval and Payment Authorization Emergency Act of 2022
|
Retained with comments from the Committee on Government Operations and Facilities
|
5/2/2022
|
5/3/2022
|
|
4/26//2022
|
Chairman Mendelson at the request of the Mayor
|
Modification Nos. 1 and 2 to Contract No. DCAM-20-CS-RFQ-0001S with Blue Skye Construction, LLC Approval and Payment Authorization Emergency Declaration Resolution of 2022
|
Retained with comments from the Committee on Government Operations and Facilities
|
5/2/2022
|
5/3/2022
|
|
4/26//2022
|
Chairman Mendelson at the request of the Mayor
|
Modification Nos. 1 and 2 to Contract No. DCAM-20- CS-RFQ-0001S with Blue Skye Construction, LLC Approval and Payment Authorization Emergency Act of 2022
|
Retained with comments from the Committee on Government Operations and Facilities
|
5/2/2022
|
5/3/2022
|
|
4/26//2022
|
Chairman Mendelson at the request of the Mayor
|
Modification Nos. 1 and 2 to Contract No. DCAM-20-CS-RFQ-0001E with Swann Construction, Inc. Approval and Payment Authorization Emergency Declaration Resolution of 2022
|
Retained with comments from the Committee on Government Operations and Facilities
|
5/2/2022
|
5/3/2022
|
|
4/26//2022
|
Chairman Mendelson at the request of the Mayor
|
Modification Nos. 1 and 2 to Contract No. DCAM-20-CS-RFQ-0001E with Swann Construction, Inc. Approval and Payment Authorization Emergency Act of 2022
|
Retained with comments from the Committee on Government Operations and Facilities
|
5/2/2022
|
5/3/2022
|
|
4/26//2022
|
Chairman Mendelson at the request of the Mayor
|
Modification Nos. 1 and 2 to Contract No. DCAM-20-CS-RFQ-0001F with Advanced Air Mechanical Systems, Inc. Approval and Payment Authorization Emergency Declaration Resolution of 2022
|
Retained with comments from the Committee on Government Operations and Facilities
|
5/2/2022
|
5/3/2022
|
|
4/26//2022
|
Chairman Mendelson at the request of the Mayor
|
Modification Nos. 1 and 2 to Contract No. DCAM-20- CS-RFQ-0001F with Advanced Air Mechanical Systems, Inc. Approval and Payment Authorization Emergency Act of 2022
|
Retained with comments from the Committee on Government Operations and Facilities
|
5/2/2022
|
5/3/2022
|
|
4/26//2022
|
Chairman Mendelson at the request of the Mayor
|
Modification Nos. 1 and 2 to Contract No. DCAM-20-CS-RFQ-0001V with DC General Construction, Inc. Approval and Payment Authorization Emergency Declaration Resolution of 2022
|
Retained with comments from the Committee on Government Operations and Facilities
|
5/2/2022
|
5/3/2022
|
|
4/26//2022
|
Chairman Mendelson at the request of the Mayor
|
Modification Nos. 1 and 2 to Contract No. DCAM-20-CS-RFQ-0001V with DC General Construction, Inc. Approval and Payment Authorization Emergency Act of 2022
|
Retained with comments from the Committee on Government Operations and Facilities
|
5/2/2022
|
5/3/2022
|
|
4/26//2022
|
Chairman Mendelson at the request of the Mayor
|
Modification Nos. 1 and 2 to Contract No. DCAM-20-CS-RFQ-0001D with General Services, Inc. Approval and Payment Authorization Emergency Declaration Resolution of 2022
|
Retained with comments from the Committee on Government Operations and Facilities
|
5/2/2022
|
5/3/2022
|
|
4/26//2022
|
Chairman Mendelson at the request of the Mayor
|
Modification Nos. 1 and 2 to Contract No. DCAM-20-CS-RFQ-0001D with General Services, Inc. Approval and Payment Authorization Emergency Act of 2022
|
Retained with comments from the Committee on Government Operations and Facilities
|
5/2/2022
|
5/3/2022
|
|
4/26//2022
|
Chairman Mendelson at the request of the Mayor
|
Modification Nos. 1 and 2 to Contract No. DCAM-20-CS-RFQ-0001A with H.E.P. Construction, Inc. Approval and Payment Authorization Emergency Declaration Resolution of 2022
|
Retained with comments from the Committee on Government Operations and Facilities
|
5/2/2022
|
5/3/2022
|
|
4/26//2022
|
Chairman Mendelson at the request of the Mayor
|
Modification Nos. 1 and 2 to Contract No. DCAM-20- CS-RFQ-0001A with H.E.P. Construction, Inc. Approval and Payment Authorization Emergency Act of 2022
|
Retained with comments from the Committee on Government Operations and Facilities
|
5/2/2022
|
5/3/2022
|
|
4/26//2022
|
Councilmembers T. White and Bonds
|
Public Charter School Applicant Amendment Act of 2022
|
Committee of the Whole
|
5/2/2022
|
5/3/2022
|
|
4/27//2022
|
Chairman Mendelson at the request of the Mayor
|
Sheridan School, Inc, Revenue Bonds Project Approval Resolution of 2022
|
Committee on Business and Economic Development
|
5/2/2022
|
5/3/2022
|
|
4/27//2022
|
Chairman Mendelson at the request of the Mayor
|
Removal of a Portion of 26th Street, N.E., from the Plan of the Permanent System of Highways of the District of Columbia Approval Resolution of 2022
|
Committee of the Whole
|
5/2/2022
|
5/3/2022
|
|
4/27//2022
|
Chairman Mendelson at the request of the Mayor
|
Board of Professional Engineering Barry Lucas Confirmation Resolution of 2022
|
Committee on Business and Economic Development
|
5/2/2022
|
45 day review begins 5/4/2022
deemed approved 6/18/2022
|
|
4/27//2022
|
Chairman Mendelson at the request of the Mayor
|
Board of Professional Engineering Mary Jean Pajak Confirmation Resolution of 2022
|
Committee on Business and Economic Development
|
5/2/2022
|
45 day review begins 5/4/2022
deemed approved 6/18/2022
|
|
4/27//2022
|
Chairman Mendelson at the request of the Mayor
|
Board of Professional Engineering Michael McKenna Confirmation Resolution of 2022
|
Committee on Business and Economic Development
|
5/2/2022
|
45 day review begins 5/4/2022
deemed approved 6/18/2022
|
|
4/27//2022
|
Chairman Mendelson at the request of the Mayor
|
Board of Professional Engineering Roland Carter Confirmation Resolution of 2022
|
Committee on Business and Economic Development
|
5/2/2022
|
45 day review begins 5/4/2022
deemed approved 6/18/2022
|
|
4/27//2022
|
Chairman Mendelson at the request of the Mayor
|
Board of Professional Engineering Samuel Wilson Confirmation Resolution of 2022
|
Committee on Business and Economic Development
|
5/2/2022
|
45 day review begins 5/4/2022
deemed approved 6/18/2022
|
|
4/27//2022
|
Chairman Mendelson at the request of the Mayor
|
Lee Montessori Public Charter School Revenue Bonds Project Approval Resolution of 2022
|
Committee on Business and Economic Development
|
5/2/2022
|
5/3/2022
|
|
4/27//2022
|
Chairman Mendelson at the request of the Mayor
|
Renewal of Professional Licenses Notice by Electronic Mail Amendment Act of 2022
|
Committee of the Whole
|
5/2/2022
|
5/3/2022
|
|
4/27/2022
|
Councilmember McDuffie
|
New Markets Tax Credit Real Property Tax Exemption Amendment Act of 2022
|
Committee on Business and Economic Development
|
5/2/2022
|
5/3/2022
|
|
4/28//2022
|
Chairman Mendelson at the request of the Mayor
|
The Lab School of Washington Revenue Bonds Project Approval Resolution of 2022
|
Committee on Business and Economic Development
|
5/2/2022
|
5/3/2022
|
|
4/28/2022
|
Chairman Mendelson at the request of the Mayor
|
Career Mobility Action Plan Establishment Emergency Declaration Resolution of 2022
|
Retained with comments from the Committee on Human Services
|
5/2/2022
|
5/3/2022
|
|
4/28/2022
|
Chairman Mendelson at the request of the Mayor
|
Career Mobility Action Plan Establishment Emergency Act of 2022
|
Retained with comments from the Committee on Human Services
|
5/2/2022
|
5/3/2022
|
|
4/28/2022
|
Chairman Mendelson at the request of the Mayor
|
Career Mobility Action Plan Establishment Temporary Act of 2022
|
Retained with comments from the Committee on Human Services
|
5/2/2022
|
5/3/2022
|
|
4/28/2022
|
Chairman Mendelson at the request of the Mayor
|
Career Mobility Action Plan Establishment Act of 2022
|
Committee on Human Services
|
5/2/2022
|
5/3/2022
|
|
4/29/2022
|
Councilmembers Lewis George, Nadeau, Pinto, Bonds, R. White, T. White, Allen
|
Green New Deal for Housing Amendment Act of 2022
|
Sequentially to the Committee on Housing and Executive Administration and the Committee on Business and Economic Development
|
5/2/2022
|
5/3/2022
|
|
4/29/2022
|
Chairman Mendelson at the request of the Mayor
|
Modification Nos. 6 and 7 to Contract No. DCRL 2020-C-0105 with Georgia Avenue Family Support Collaborative Approval and Payment Authorization Emergency Declaration Resolution of 2022
|
Retained with comments from the Committee on Human Services
|
5/2/2022
|
5/3/2022
|
|
4/29/2022
|
Chairman Mendelson at the request of the Mayor
|
Modification Nos. 6 and 7 to Contract No. DCRL-2020-C-0105 with Georgia Avenue Family Support Collaborative Approval and Payment Authorization Emergency Act of 2022
|
Retained with comments from the Committee on Human Services
|
|||
4/29/2022
|
Chairman Mendelson at the request of the Mayor
|
Proposed contract with Prism International, LLC in the not-to-exceed amount of $10,000,000 shall provide information technology equipment and software
|
Retained with comments from the Committee on Government Operations and Facilities
|
5/2/2022
|
10 day review begins 5/2/2022
deemed approved 5/12/2022
|
|
4/29/2022
|
Chairman Mendelson at the request of the Mayor
|
Proposed contract to exercise option year three (3) with Limbic Systems, Inc. in the not-to-exceed amount of $10,000,000 shall continue to provide mission oriented business integrated services
|
Retained with comments from the Committee on Government Operations and Facilities
|
5/2/2022
|
10 day review begins 5/2/2022
deemed approved 5/12/2022
|
|
4/29/2022
|
Chairman Mendelson at the request of the DCHA
|
Proposed contract between the District of Columbia Housing Authority (“DCHA”) and Padula Construction Co, Inc. (“Padula”) in the amount of $2,449,077.99 for the Stabilization of 51 Occupied Townhouses at Stoddert Terrace, located at 155 Ridge Road in the Southeast quadrant of Washington, DC (the “Project”)
|
Retained with comments from the Committee on Housing and Executive Administration
|
5/2/2022
|
10 day review begins 5/2/2022
deemed approved 5/12/2022
|
|
4/29/2022
|
Chairman Mendelson at the request of the DCHA
|
Proposed contract between the District of Columbia Housing Authority (“DCHA”) and Micon Construction, Inc. (“Micon”) in the amount of $5,173,536.51 for the Phase 1 Stabilization of 98 Townhomes at Benning Terrace, located at 4450 G Street in the Southeast quadrant of Washington, D.C. (the “Project”)
|
Retained with comments from the Committee on Housing and Executive Administration
|
5/2/2022
|
10 day review begins 5/2/2022
deemed approved 5/12/2022
|
|
5/2/2022
|
Councilmember Bonds
|
Certificate of Assurance Moratorium Emergency Declaration Resolution of 2022
|
5/2/2022
|
5/2/2022
|
||
5/2/2022
|
Councilmember Bonds
|
Certificate of Assurance Moratorium Extension Emergency Amendment Act of 2022
|
5/2/2022
|
5/2/2022
|
||
5/2/2022
|
Councilmember Bonds
|
Certificate of Assurance Moratorium Extension Temporary Amendment Act of 2022
|
5/2/2022
|
5/2/2022
|
||
5/2/2022
|
Councilmembers T. White, Bonds
|
Immigrant, Refugee and Asylum Seeker Rights Education Act of 2022
|
Committee on Human Services
|
5/2/2022
|
5/2/2022
|
|
5/2/2022
|
Councilmembers T. White, Allen, Bonds
|
Collective Faith Community Historic Contribution Inclusion Amendment Act of 2022
|
Committee of the Whole
|
5/2/2022
|
5/2/2022
|
|
5/2/2022
|
Councilmembers T. White, Lewis George
|
Displaced Owner of Destroyed Property Tax Relief Act of 2022
|
Committee on Business and Economic Development
|
5/2/2022
|
5/2/2022
|
|
5/2/2022
|
Councilmembers Lewis George, Pinto, Henderson, Nadeau, T. White, Bonds, R. White
|
Green New Deal for a Lead-Free DC Amendment Act of 2022
|
Sequentially Title I- Committee on Transportation and the Environment
Title II- Committee on Labor and Workforce Development and then to the Committee of the Whole with comments from the Committee on Government Operations and Facilities
|
5/2/2022
|
5/2/2022
|
|
4/29/2022
|
Chairman Mendelson
|
Correspondence from the Mayor – Office of Racial Equity Fiscal Year 2023 Budget Process Summary
|
4/28/2022
|
4/28/2022
|
Date
Introduced |
Sponsor(s) | Title | Number
Assigned |
Committee
Assigned |
Date
Circulated |
Date of
Official Action |
5/4/2022 | Chairman Mendelson at the Request of the Mayor | Proposed contract with Elliott & Frantz, Inc. in the amount of $1,750,231
shall provide three units that will be used as street sweepers within the District |
CA | Retained with Comments from the Committee on Transportation and the Environment
|
5/5/2022 | 10 day review begins 5/5/2022
deemed approved 5/15/2022 |
5/5/2022 | Chairman Mendelson at the Request of the Mayor | Proposed contract to exercise option year three (3) with DigiDoc, Inc. dba Document Managers in the not-to-exceed amount of $10,000,000 shall continue to provide temporary support services | CA | Retained with Comments from the Committee on Government Operations and Facilities | 5/5/2022 | 10 day review begins 5/6/2022
deemed approved 5/16/2022 |
5/5/2022 | Chairman Mendelson at the Request of the Mayor | Proposed contract to exercise option year four (4) with Tax Management Associates, Inc. in the amount of $ 4,830,000.00 shall continue to provide audit services to verify the accuracy and legitimacy of deductions and credits filed with the Real Property Tax Administration for all of the District residential property tax relief programs on behalf of the Office of Tax and Revenue | CA | Retained with Comments from the Committee on Business and Economic Development | 5/5/2022 | 10 day review begins 5/6/2022
deemed approved 5/16/2022 |
5/5/2022 | Chairman Mendelson at the request of the Mayor | Correspondence from the Mayor – Fiscal Year 2021 District Government Workforce New Hire Residency Report | RC | 5/5/2022 | 5/5/2022 |
Date
Introduced |
Sponsor(s) | Title | Number
Assigned |
Committee
Assigned |
Date
Circulated |
Date of
Official Action |
5/3/2022 | Chairman Mendelson at the request of DCHFA | Housing Finance Agency provides notice of its proposal for tax-exempt and/or
taxable multifamily housing mortgage revenue bond financing in an amount not to exceed $45,355,000 for the rehabilitation and equipping of the Villages of East River (the “Development”). The Development is expected to be located at 1635 V Street SE, 1655 W Street SE, 1659 W Street SE, 1737 W Street SE, 223 Anacostia Road SE, 300 Anacostia Road SE, 304 Anacostia Road SE, 224 36th Street SE, 3500 Ely Place SE, 3504 Ely Place SE, 301 37th Street SE, 305 37th Street SE, 3415 Croffut Place SE, 3425 Croffut Place SE, 5115 Drake Place SE and 450 51st Street SE, Washington, D.C. 20020 and 20019, in Wards 7 and 8. After completion, the Development is expected to consist of approximately two hundred two (202) residential rental units. |
HFA | Retained with comments from the Committee on Housing and Executive Administration | 5/4/2022 | 30 day review begins 5/18/2022
deemed approved 7/1/2022 |
5/3/2022 | Chairman Mendelson at the request of DCHFA | Housing Finance Agency provides notice of its proposal for tax-exempt and/or taxable multifamily housing mortgage revenue bond financing in an amount not to exceed $67,500,000 for the new construction and equipping of the Carl F. West Estates project (the “Development”). The Development is expected to be located at 2801 14th Street NW, Washington, DC 20009, in Ward 1. After completion, the Development is expected to consist of one (1) building, containing a total of approximately one hundred seventy-nine (179) residential rental units. | HFA | Retained with comments from the Committee on Housing and Executive Administration | 5/4/2022 | 30 day review begins 5/18/2022
deemed approved 7/1/2022 |
5/4/2022 | Chairman Mendelson at the Request of the Mayor | Proposed contract to exercise option year four (4) with Cradle Systems, LLC in the not-to-exceed amount of $10,000,000 shall continue to provide information technology equipment and software | CA | Retained with Comments from the Committee on Government Operations and Facilities | 5/4/2022 | 10 day review begins 5/5/2022
deemed approved 5/15/2022 |
5/4/2022 | Chairman Mendelson at the Request of the Mayor | Correspondence from the Mayor – Fiscal Year 2021 Private Lead Service Line Replacement Payment Assistance Program Annual Report | RC | 5/4/2022 | 5/4/2022 | |
5/4/2022 | Chairman Mendelson at the Request of the Mayor | Correspondence from the Mayor – Public Restrooms Facilities Installation and Promotion Working Group Recommendations Report | RC | 5/4/2022 | 5/4/2022 | |
5/4/2022 | Chairman Mendelson at the Request of the District of Columbia Retirement Board | Correspondence from the District of Columbia Retirement Board – DCRB Trustees’ Financial Disclosure Statements for CY 2021 | RC | 5/4/2022 | 5/4/2022 | |
5/4/2022 | Chairman Mendelson at the Request of the Mayor | Limited Coronavirus Procurement Second Extension Congressional Review Emergency Amendment Act of 2022
Filed by: Councilmember Robert White |
Bill | 5/4/2022 | 5/4/2022 |
Date
Introduced |
Sponsor(s) | Title | Number
Assigned |
Committee
Assigned |
Date
Circulated |
Date of
Official Action |
4/18/2022 | Chairman Mendelson at the request of the Attorney General | Omnibus Firearm and Ghost Gun Clarification Amendment Act of 2022 | Bill | Committee on Judiciary and Public Safety | 4/18/2022 | 4/19/2022 |
4/18/2022 | Councilmember Allen | Overbeck Alley Designation Act of 2022 | Bill | Committee of the Whole | 4/18/2022 | 4/19/2022 |
4/18/2022 | Chairman Mendelson at the request of the Mayor | Transfer of Jurisdiction Over a Portion of Reservation 405, S.O. 21-07525, Approval Resolution of 2022 | PR | Committee of the Whole | 4/18/2022 | 4/19/2022 |
4/18/2022 | Chairman Mendelson at the request of the Mayor | Modification Nos. 1 and 2 to Contract No. DCAM-20-CS-RFQ-0001U with City Construction, LLC Approval and Payment Authorization Emergency Declaration Resolution of 2022 | PR | Retained with comments from the Committee on Government Operations and Facilities | 4/18/2022 | 4/19/2022 |
4/18/2022 | Chairman Mendelson at the request of the Mayor | Modification Nos. 1 and 2 to Contract No. DCAM-20-CS-RFQ-0001U with City Construction, LLC Approval and Payment Authorization Emergency Act of 2022 | Bill | Retained with comments from the Committee on Government Operations and Facilities | 4/18/2022 | 4/19/2022 |
4/18/2022 | Chairman Mendelson at the request of the Mayor | Modification Nos. 1 and 2 to Contract No. DCAM-20-CS-RFQ-0001N with Broughton Construction Company, LLC Approval and Payment Authorization Emergency Declaration Resolution of 2022 | PR | Retained with comments from the Committee on Government Operations and Facilities | 4/18/2022 | 4/19/2022 |
4/18/2022 | Chairman Mendelson at the request of the Mayor | Modification Nos. 1 and 2 to Contract No. DCAM-20-CS-RFQ-0001N with Broughton Construction Company, LLC Approval and Payment Authorization Emergency Act of 2022 | Bill | Retained with comments from the Committee on Government Operations and Facilities | 4/18/2022 | 4/19/2022 |
4/18/2022 | Chairman Mendelson at the request of the Mayor | Clinical Laboratory Practitioners Amendment Act of 2022 | Bill | Committee on Health | 4/18/2022 | 4/19/2022 |
4/18/2022 | Chairman Mendelson at the request of the Mayor | Youth Apprenticeship Advisory Committee Dr. Burt Barnow Confirmation Resolution of 2022 | PR
|
Committee on Labor and Workforce Development | 4/18/2022 | 45 day review begins 4/20/2022
deemed approved 6/4/22 |
4/18/2022 | Chairman Mendelson at the request of the Mayor | Youth Apprenticeship Advisory Committee Christopher Riley Confirmation Resolution of 2022 | PR | Committee on Labor and Workforce Development | 4/18/2022 | 45 day review begins 4/20/2022
deemed approved 6/4/22 |
4/18/2022 | Chairman Mendelson at the request of the Mayor | Youth Apprenticeship Advisory Committee Elizabeth DeBarros Confirmation Resolution of 2022 | PR | Committee on Labor and Workforce Development | 4/18/2022 | 45 day review begins 4/20/2022
deemed approved 6/4/22 |
4/18/2022 | Chairman Mendelson at the request of the Mayor | Youth Apprenticeship Advisory Committee Eric Jones Confirmation Resolution of 2022 | PR | Committee on Labor and Workforce Development | 4/18/2022 | 45 day review begins 4/20/2022
deemed approved 6/4/22 |
4/18/2022 | Chairman Mendelson at the request of the Mayor | Youth Apprenticeship Advisory Committee Taylor White Confirmation Resolution of 2022 | PR | Committee on Labor and Workforce Development | 4/18/2022 | 45 day review begins 4/20/2022
deemed approved 6/4/22 |
4/18/2022 | Chairman Mendelson at the request of the Mayor | Youth Apprenticeship Advisory Committee William Dean Confirmation Resolution of 2022 | PR | Committee on Labor and Workforce Development | 4/18/2022 | 45 day review begins 4/20/2022
deemed approved 6/4/22 |
4/18/2022 | Chairman Mendelson at the request of the Mayor | Proposed contract with Verizon Business Network Services, LLC in the amount of $3,470,986.59 shall manage and maintain telecommunications services for the Government of the District of Columbia via the General Services Administration’s Enterprise Infrastructure Solutions contract | CA | Retained with comments from the Committee on Government Operations and Facilities | 4/18/2022 | 10 day review begins 4/19/2022
deemed approved 4/29/2022 |
4/18/2022 | Chairman Mendelson at the request of the Mayor | Proposed contract with Qlarant Quality Solutions, Inc. in the amount of $1,694,989.30 shall conduct provider certification reviews of service providers of the District’s persons with intellectual and developmental disabilities | CA | Retained with comments from the Committee on Health | 4/18/2022 | 10 day review begins 4/19/2022
deemed approved 4/29/2022 |
4/18/2022 | Chairman Mendelson at the request of the Mayor | Proposed contract with Bennett Group, Inc. in a guaranteed minimum amount of $50 and an aggregate maximum amount of $15,000,000 will provide construction services, as awarded through task order agreements, at various facilities within DGS’s real estate portfolio | CA | Retained with comments from the Committee on Government Operations and Facilities | 4/18/2022 | 10 day review begins 4/19/2022
deemed approved 4/29/2022 |
4/18/2022 | Chairman Mendelson at the request of the Mayor | Proposed contract with Keystone Plus Construction Corporation in a guaranteed minimum amount of $50 and an aggregate maximum amount of $15,000,000 will provide construction services, as awarded through task order agreements, at various facilities within DGS’s real estate portfolio | CA | Retained with comments from the Committee on Government Operations and Facilities | 4/18/2022 | 10 day review begins 4/19/2022
deemed approved 4/29/2022 |
4/18/2022 | Chairman Mendelson at the request of the Mayor | Proposed contract with Parkinson Construction Company, Inc. in a guaranteed minimum amount of $50 and an aggregate maximum amount of $15,000,000 will provide construction services, as awarded through task order agreements, at various facilities within DGS’s real estate portfolio | CA | Retained with comments from the Committee on Government Operations and Facilities | 4/18/2022 | 10 day review begins 4/19/2022
deemed approved 4/29/2022 |
4/18/2022 | Chairman Mendelson at the request of the Mayor | Proposed contract with Chiaramonte Construction Company in a guaranteed minimum amount of $50 and an aggregate maximum amount of $15,000,000 will provide construction services, as awarded through task order agreements, at various facilities within DGS’s real estate portfolio | CA | Retained with comments from the Committee on Government Operations and Facilities | 4/18/2022 | 10 day review begins 4/19/2022
deemed approved 4/29/2022 |
4/18/2022 | Chairman Mendelson at the request of the Mayor | Proposed contract with KADCON Corporation in a guaranteed minimum amount of $50 and an aggregate maximum amount of $15,000,000 will provide construction services, as awarded through task order agreements, at various facilities within DGS’s real estate portfolio | CA | Retained with comments from the Committee on Government Operations and Facilities | 4/18/2022 | 10 day review begins 4/19/2022
deemed approved 4/29/2022 |
4/18/2022 | Chairman Mendelson at the request of the Mayor | Proposed contract with HRGM Corporation in a guaranteed minimum amount of $50 and an aggregate maximum amount of $15,000,000 will provide construction services, as awarded through task order agreements, at various facilities within DGS’s real estate portfolio | CA | Retained with comments from the Committee on Government Operations and Facilities | 4/18/2022 | 10 day review begins 4/19/2022
deemed approved 4/29/2022 |
4/18/2022 | Chairman Mendelson at the request of the Mayor | Proposed contract with Aligned Development Strategies, Inc. in the not-to-exceed amount of $10,000,000 shall provide mission oriented business integrated services | CA | Retained with comments from the Committee on Government Operations and Facilities | 4/18/2022 | 10 day review begins 4/19/2022
deemed approved 4/29/2022 |
4/18/2022 | Chairman Mendelson at the request of the Mayor | Proposed contract with Hayat Brown, LLC. in the not-to-exceed amount of $ 7,500,000 shall provide construction management and inspection services for DC PLUG feeder construction projects | CA | Retained with comments from the Committee on Government Operations and Facilities | 4/18/2022 | 10 day review begins 4/19/2022
deemed approved 4/29/2022 |
4/18/2022 | Chairman Mendelson | Medical Marijuana Patient Access Extension Congressional Review Emergency Declaration Resolution of 2022 | PR | Retained by the Council | 4/18/2022 | 5/3/2022 |
4/18/2022 | Chairman Mendelson | Medical Marijuana Patient Access Extension Congressional Review Emergency Declaration Resolution of 2022 | Bill | Retained by the Council | 4/18/2022 | 5/3/2022 |